What building work costs
House Renovation Cost: UK Prices for Each Job and Trade
Pricing a house renovation means pricing every job in it, from the rewire to the paint. Here are UK prices for each job in an average 3-bedroom house, the day rates for each trade, a budget added up with its contingency, the costs people forget and the order the work goes in.
How much a house renovation costs
How much a house renovation costs depends on which jobs your house needs, so price those jobs, add them up and put a contingency on top. Checkatrade’s house renovation cost guide prices each job for an average 3-bedroom house and recommends adding 10% to 15% to the budget as the contingency.
The size, age and condition of the property all move the price, along with how complex the work is, whether there is structural or extension work, the quality of materials, fixtures and finishes, the decoration and where you live, Checkatrade says.
House renovation prices for each job
Excluding VAT, these are Checkatrade’s prices for each job in an average 3-bedroom house. The three replastering rows are different ways to do the same job, so a budget takes only one of them.
| Job | Range, excluding VAT | Average, excluding VAT |
|---|---|---|
| Gas and electrics | ||
| New gas supply | £500 to £2,500 | £1,500 |
| New heating system | £3,000 to £8,500 | £5,500 |
| Rewiring | £4,000 to £8,500 | £6,250 |
| Internal work | ||
| Replastering option 1: replaster walls | £10,000 to £15,000 | £12,000 |
| Replastering option 2: re-skim walls and ceilings | £5,000 to £12,500 | £8,750 |
| Replastering option 3: hack off and replaster walls and ceilings | £16,000 to £32,000 | £26,500 |
| Replace skirting throughout | £2,200 to £3,800 | £3,000 |
| Paint walls and ceilings | £5,000 to £7,000 | £6,000 |
| New cloakroom WC, including tiling | £1,500 to £2,500 | £2,000 |
| New kitchen | £7,000 to £25,000 | £17,500 |
| Structural and outside work | ||
| Knock down walls | £500 to £3,500 | £2,000 |
| Kitchen extension, 12m² | £15,000 to £24,000 | £19,500 |
| Skirting for a new extension | £200 to £500 | £350 |
| New roof | £6,500 to £18,000 | £12,250 |
| Damp proofing course | £500 to £5,000 | £2,750 |
| Windows | £2,500 to £8,000 | £5,250 |
| French doors | £1,500 to £3,500 | £2,500 |
On Checkatrade’s figures, a new heating system of about £5,500 means a combi boiler and radiators, a downstairs WC of around £2,000 includes the floor tiling, pipework and waste, and French doors at about £2,500 include the lintels, brickwork and plasterwork. The same guide puts a new bathroom at around £7,000 on average.
Knocking through a load-bearing wall averages £1,250 to £1,750 on Checkatrade’s figures, and the job can be done in as little as two days. Repairing an existing roof instead of replacing it costs £210 to £465 per m², Checkatrade says.
Labour costs and day rates for each trade
Day rates on a renovation run from £120 for an apprentice to £400 for a plumber or an electrician, on Checkatrade’s figures.
| Trade | Day rate | Average day rate |
|---|---|---|
| Plumber | £250 to £400 | £325 |
| Electrician | £250 to £400 | £325 |
| Roofer | £200 to £250 | £225 |
| Double glazing installer | £200 to £250 | £225 |
| Plasterer | £200 to £250 | £225 |
| Carpenter | £200 to £250 | £225 |
| Tiler | £200 to £250 | £225 |
| Painter and decorator | £150 to £250 | £200 |
| General builder | £200 to £250 | £225 |
| Labourer | £150 to £180 | £165 |
| Apprentice | £120 to £150 | £135 |
A new central heating system and boiler takes one to two weeks and around £3,000 or more in labour, Checkatrade says. Fully rewiring a house takes around 6 to 15 days, and the same guide puts the electrician at a minimum of £2,100.
Larger projects are usually quoted as a full job rather than by the day or the hour, because the quote may need to include materials, several trades, waste removal, structural work and building regulations, Checkatrade’s builder day rate guide says. That guide puts a building company, the kind suited to renovations and jobs needing several trades, at around £400 a day, and says the rate might include project management, admin support, insurance, equipment and a wider team.
Hidden costs and how much contingency to add
Structural work brings survey and planning application costs, and major work can mean paying rent for temporary accommodation while it goes on, Checkatrade says. The 10% to 15% contingency Checkatrade recommends is for discoveries such as asbestos, dangerous wiring or rotting beams.
To budget, add the low end of every job’s range together and the high end together, then add 10% to the low total and 15% to the high total. A house that needs rewiring, new heating, re-skimmed walls and ceilings, new skirting and a repaint comes out like this on Checkatrade’s prices, excluding VAT.
Rewire, new heating and redecoration, 3-bedroom house
| Rewiring | £4,000 to £8,500 |
|---|---|
| New heating system | £3,000 to £8,500 |
| Re-skim walls and ceilings | £5,000 to £12,500 |
| Replace skirting throughout | £2,200 to £3,800 |
| Paint walls and ceilings | £5,000 to £7,000 |
| Contingency, 10% to 15% | £1,920 to £6,045 |
Total £21,120 to £46,345
Excluding VAT, from Checkatrade's price table for an average 3-bedroom house. The jobs come to £19,200 to £40,300, and the contingency is 10% of the low total and 15% of the high total. Leaves out a new gas supply, a kitchen, a bathroom, windows, the roof, floors, surveys and any structural work.
The order of work for a full house renovation
Checkatrade sets out an order for a full refurbishment that starts with the structure and finishes with the decorating, and doing the structural work first is also on its list of ways to save money.
A full refurbishment, in order
- Structural work, such as walls, extensions and the roof
- Plumbing, rewiring and heating
- Replastering and preparation
- Floors and tiles
- Finishing touches such as decorating
How to save money on a house renovation
Checkatrade’s other ways to save include using reclaimed or second-hand materials, renovating in phases and booking work in off-peak seasons, although winter can bring delays. It also recommends keeping your estimates in a spreadsheet and getting at least three like-for-like quotes for each trade.
Quotes only compare like for like when every firm prices the same written description. Ask three plasterers to replaster the house and one may price re-skimming the existing plaster while another prices hacking it off first. For the walls and ceilings, Checkatrade’s price table averages £8,750 for a re-skim and £26,500 for hacking off, excluding VAT.
Describing the plastering for a quote
Do this
Re-skim the existing plaster on the walls and ceilings in every room of a 3-bedroom house once the rewiring and heating are finished, including preparation and waste removal, ready for painting
Not this
Plastering throughout the house
If you would rather one firm ran every trade, the Nottingham building firms we compare include Buon Construction in St Ann’s, which keeps architects, designers, builders, plasterers, plumbers and electricians in-house, renovates single rooms and whole houses and gives fixed-price quotes. Westbull Construction in Ruddington has been building in Nottingham since 1990, and its work includes home renovations, roofing, kitchens and bathrooms.
Common questions
How much does it cost to renovate a 3-bed house?
It depends on which jobs the house needs, so price each job and add a contingency of 10% to 15%, as Checkatrade recommends. For example, rewiring, a new heating system, re-skimming the walls and ceilings, new skirting throughout and painting an average 3-bedroom house come to £19,200 to £40,300 excluding VAT, using the prices in Checkatrade's table, or £21,120 to £46,345 with the contingency.
What order should you renovate a house in?
Start with the structure and finish with the decorating. Checkatrade's order for a full refurbishment runs from structural work such as walls, extensions and the roof, to plumbing, rewiring and heating, then replastering and preparation, then floors and tiles, with finishing touches such as decorating last.
How much does it cost to rewire a house?
Rewiring an average 3-bedroom house costs £4,000 to £8,500, an average of £6,250, excluding VAT, in Checkatrade's price table. Checkatrade says a full rewire takes around 6 to 15 days, with a minimum of £2,100 for an electrician.
How much does it cost to replaster a house?
Replastering the walls and ceilings of an average 3-bedroom house costs £5,000 to £12,500 if the existing plaster is re-skimmed and £16,000 to £32,000 if it is hacked off, excluding VAT, in Checkatrade's price table. Replastering the walls alone costs £10,000 to £15,000. The three are alternatives, so a budget takes one of them.
How much contingency should you add to a renovation budget?
Add 10% to 15% on top of the budget, Checkatrade recommends, to cover discoveries such as asbestos, dangerous wiring or rotting beams. It also suggests keeping your estimates in a spreadsheet and getting at least three like-for-like quotes for each trade.
Which renovations add the most value to a house?
Kitchens, bathrooms, extensions or added floor space and improved energy efficiency are typically the biggest value-adding improvements, according to Checkatrade. Excluding VAT, its price table puts a new kitchen at £7,000 to £25,000 and a 12m² kitchen extension at £15,000 to £24,000.
Where the figures come from
- Checkatrade, house renovation cost read 2026-09-17
- Checkatrade, builder day rate read 2026-09-17
- Checkatrade, load-bearing wall removal cost read 2026-09-17