What building work costs

Double Storey Extension Cost: UK Prices per m² and Size

Updated

The cost of a double storey extension per square metre climbs with the quality of the build. Here are the UK prices per m², what a 5m x 4m side extension and a 60m² build cost, the fees for drawings, a surveyor and a party wall agreement, the planning limits for building more than one storey and how long the work takes.

Double storey extension cost per m²

Checkatrade’s double storey extension cost guide prices a double storey extension at £1,650 to £3,000 per m², excluding VAT. The rate is split by the quality of the build.

Quality Range per m² Average per m²
Standard £1,650 to £2,150 £1,900
Good £1,830 to £2,350 £2,090
Excellent £2,150 to £3,000 £2,575

A double storey extension typically costs 50% to 70% more than a single storey extension, not double, Checkatrade’s guide says. Some costs, such as the foundations, site preparation and scaffolding, are shared by the two storeys.

Double storey side extension cost

A 5m x 4m double storey side, front or wraparound extension costs from around £66,000, excluding VAT, on Checkatrade’s figures. Side extensions are popular on detached and semi-detached homes, the same guide says.

Rear extensions and building over a garage

Rear double storey extensions are the most popular, though they can sharply reduce your garden space, Checkatrade’s guide says. Building on top of an existing garage needs a structural survey first, to confirm the garage can take the weight.

Two storey extension cost for 60m²

Checkatrade’s house extension cost guide prices a two-storey extension based on 60m² at £108,000 to £180,000, with an average of £144,000, excluding VAT.

Checkatrade’s double storey guide prices three parts of a 60m² double storey build, 30m² per floor, at an average of £6,000 for the foundations, £36,000 for the framing and £14,000 for the roofing, excluding VAT. Each is one part of the work, not a price for the whole extension.

Extra costs for fees, a kitchen or a bathroom

Checkatrade’s guide lists these extra costs, excluding VAT. The kitchen and bathroom rows are what each adds to the cost of the extension.

Extra cost Range Average
Extension planning drawings £500 to £1,500 £950
Surveyor’s fees £500 to £2,000 £1,250
Party wall agreement £900 to £2,700 £1,000
Bathroom £2,500 to £11,000 £6,750
Kitchen £10,000 to £25,000 £15,000

A kitchen or bathroom costs more than a bedroom because of the extra electrics, plumbing and finish, Checkatrade’s guide says. An architect is not a legal requirement, and if you use one, the fees run at 5% to 12% of the whole construction cost, on Checkatrade’s figures.

The drawings, the surveyor and the party wall agreement are fees rather than building work, and the agreement costs roughly £1,000 per neighbour on Checkatrade’s figures.

Drawings, surveyor and party wall fees added up

Extension planning drawings£500 to £1,500
Surveyor's fees£500 to £2,000
Party wall agreement£900 to £2,700

Total £1,900 to £6,200

Rows and total exclude VAT, on Checkatrade's figures. The total leaves out the building work itself and an architect's fees, if you use one.

What affects the cost of a double storey extension

Checkatrade’s guide names size, quality and finish, such as plastering and painting, among the factors in the price. Groundworks, scaffolding for the work at height, site access, drainage for a kitchen or bathroom, and electrics fitted and inspected by a qualified electrician all move the price too. Structural changes may also affect your home insurance premium.

For labour, an experienced builder charges around £50 an hour and a self-employed builder around £40, with plumbers and electricians at around £50, on Checkatrade’s figures. Ask every builder to name the groundworks, scaffolding, drainage and electrics in the quote, so you can see what a cheaper price leaves out.

Describing a double storey extension on a quote

Do this

Build a 5m by 4m two-storey side extension to the approved drawings, including groundworks and foundations, scaffolding, roof, windows and doors, drainage, plumbing and electrics for the kitchen, plastered and ready to decorate

Not this

Two storey side extension as per drawings

Among the Nottingham builders compared for extensions, D&M Building Services in Long Eaton builds single and double-storey extensions with an in-house construction team, works to detailed quotations with a defined scope and staged payments, and is a Federation of Master Builders member.

Planning permission for a double storey extension

Permitted development rights let you extend a house without applying for planning permission in many circumstances, but every side extension of more than one storey needs householder planning permission, the Planning Portal says. On Article 2(3) land, every rear extension of more than one storey needs it too, and that land includes conservation areas and National Parks, the Planning Portal’s guidance note says.

Elsewhere, a double storey rear extension has to meet the conditions for more than one storey, and the limits that apply to every extension, to be built without an application. Go beyond any of them and it is likely that you will need to apply for householder planning permission, the Planning Portal says.

Permitted development for more than one storey

  • No more than 3 metres beyond the rear wall of the original house
  • Not within 7 metres of any boundary opposite the rear wall
  • A roof pitch matching the existing house as far as practicable
  • Upper-floor side windows obscure-glazed and non-opening, unless the opening part is more than 1.7 metres above the floor

Party wall notice for a double storey extension

The Party Wall etc. Act 1996 covers work to an existing party wall, building a new wall at or astride the boundary, and excavating within 3 metres of a neighbour’s building to below its foundations, or within 6 metres where the dig meets a line drawn down at 45 degrees from the bottom of those foundations, among other work, the GOV.UK explanatory booklet says.

You have to give notice at least 2 months before work to an existing party wall, and at least 1 month before building a new wall at the boundary or excavating, GOV.UK’s booklet says. If your neighbour has done nothing 14 days after the notice is served, a dispute is deemed to have arisen, and one agreed surveyor, or one surveyor each, draws up an award. Where the work is solely for your benefit, you usually pay all the costs of the award, including your neighbour’s surveyor, on the booklet’s guidance.

Do not start work without serving party wall notice

Work started without proper notice can be stopped by a court injunction. Once notice is served, wait out the notice period unless your neighbour agrees in writing to an earlier start.

How long a double storey extension takes

Most double storey extensions take 8 to 14 weeks of construction, Checkatrade’s guide says. Before that, the designs, drawings, planning permission and structural planning take from 2 weeks to several months.

Common questions

How much does a two storey extension cost in the UK?

A two storey extension costs £1,650 to £3,000 per m² in the UK, excluding VAT, on Checkatrade's double storey figures. Checkatrade's house extension guide separately prices a 60m² two-storey extension at £108,000 to £180,000, with an average of £144,000, excluding VAT.

How much does a double storey extension cost per m²?

A double storey extension costs £1,900 per m² on average for standard quality, £2,090 for good quality and £2,575 for excellent quality, excluding VAT, on Checkatrade's figures. The full range runs from £1,650 per m² at the low end of standard to £3,000 at the top of excellent.

How much does a double storey side extension cost?

A 5m x 4m double storey side extension costs from around £66,000, excluding VAT, on Checkatrade's figures. Every side extension of more than one storey needs householder planning permission, on the Planning Portal's rules.

How much more does a double storey extension cost than a single storey?

A double storey extension typically costs 50% to 70% more than a single storey extension, not double, Checkatrade's guide says. Some costs, such as the foundations, site preparation and scaffolding, are shared by the two storeys.

Do you need planning permission for a double storey extension?

You need householder planning permission for any side extension of more than one storey, and for a rear extension of more than one storey on Article 2(3) land such as a conservation area, on the Planning Portal's rules. Elsewhere, a rear extension of more than one storey can be permitted development if it goes no more than 3 metres beyond the rear wall of the original house and meets the other conditions.

How long does a double storey extension take to build?

Most double storey extensions take 8 to 14 weeks of construction, Checkatrade's guide says. The designs, drawings, planning permission and structural planning before that take from 2 weeks to several months.

How much does a party wall agreement cost for a double storey extension?

A party wall agreement costs £900 to £2,700, excluding VAT, on Checkatrade's figures, which put it at roughly £1,000 per neighbour. Notice has to be served at least 2 months before work to an existing party wall, and at least 1 month before building a new wall at the boundary or excavating near a neighbour's building, GOV.UK's party wall booklet says.